Solutions · Highways
Roadside assets on live networks, connected.
Highways programmes run in short windows, on live carriageways, often under traffic management — with several teams and suppliers working the same corridor. Arbrium gives them one connected record of the assets, the inspections and the work.

In live use
The programmes Arbrium runs on the road network today.
Ash dieback programmes
Condition class, priority and recommended works for individual trees, groups and belts — surveyed against the client's own asset references.
Boundary and fenceline surveys
Fencing captured as measured lines, grouped by road reference, with condition, install and removal quantities.
Soft estate and woodland
Linear belts and woodland blocks as polygons, alongside the individual trees within them.
Drone evidence
Crown imagery captured by Arbrium Air and returned to the right asset record.
Built for highways
The details highways work depends on.
- Available
The client's asset layer as the survey map
Imported as supplied, British National Grid converted, references kept.
- Available
Highway boundary on the map
The client's boundary as a reference layer, with each asset's distance to it — and, where the boundary encloses a site, whether the asset sits inside it.
- Available
Road reference filled from location
- Available
Returns in the client's GIS standard
British National Grid Shapefile with separate point, line and polygon layers; CSV and Excel with easting/northing.
- Available
Drone separation checks
Inspection points checked against the 50m separation requirement in GG 954 before a mission is flown.
- Available
Read-only access for the asset owner, per project
- Available
Vegetation–boundary dependencies across projects
- Planned
Drainage, structures, lighting and signs
Many suppliers, one corridor
Different teams inspect the same network. Arbrium connects what they find.
PROJECT
Vegetation programme
Surveyed by the vegetation team
Tree
Tree T-882
Recommended: Fell
Tree
Tree T-883
Recommended: Fell
must be done before
1.7m apart · felling sits inside the fence's work zone · different project
Confirmed by a personPROJECT
Boundary renewal
Delivered by the boundary contractor
Boundary fence
Fence F-104
Recommended: Replace
Coordination opportunity
3 planned interventions within 250m — review for shared access and traffic management.
