Cross-project intelligence
See what individual projects cannot.
An individual supplier understands their own project. The infrastructure owner needs to understand what all the authorised activity on the network means together — and Arbrium is built to show it.
Many projects, one network
Separate projects. Shared ground.
- Vegetation projectAvailable↕
- Boundary projectAvailable↕
- Drainage projectPlanned↕
- Vehicle restraint projectPlanned
Every authorised project, on one connected graph
Each party sees only what it's allowed to.
- Linked assets across projects
- Potential delivery dependencies
- Overlapping activity
- Coordinated-work opportunities
- T-882Fell · ash, class 417.0 mF-104Replace
- T-A0614Fell · within 21 m height8.4 mF-0311Not surveyed yet
- T-A0622Fell · height not recorded6.1 mF-0312Not surveyed yet
- T-A0650Crown lift3.2 mF-0327Not surveyed yet
Available today
Linked assets across projects.
Where do projects meet?
Assets on one project within reach of assets on another.
What should wait for what?
Felling before fence replacement, so the new fence isn't damaged.
Which work belongs together?
Where both assets need work, one mobilisation instead of two.
Which part of the asset?
The stretch of fence a falling tree could strike — not the whole 500 m section.
Only what each party may see
One picture for the owner. The right slice for everyone else.
The asset owner sees every authorised project together. A supplier sees their own work, and a relationship is only shown to someone who can see both ends of it.
Suggestions are reviewed by the asset owner, and every decision is recorded with who made it and when.
What a supplier sees when related work sits in a project they can't access.
In the product
What's live, and what's next.
- Available
Linked assets across projects
Map, table, spreadsheet and one-page briefing.
- Available
Potential grouped work
Where the tree and the fence both need work.
- Available
Owner confirm and reject, with history
Stamped with who decided and when; rejected pairs stay on the record.
- Available
Related activity and coordination opportunities on a project
- Available
Live programme picture for the asset owner
Progress, findings and hotspots across projects.
- Planned
Drainage, restraint systems and structures projects
- Planned
Shared access and traffic-management windows